WWIS Header
Log in
updated 12:49 PM UTC, Oct 6, 2015

Highway Construction to be Discussed Next Month

  • Written by Brian B
  • Published in News


An informational meeting about the US 12 (Water St) and WIS 54 (Main St.) Highway improvement projects to begin the summer of 2013 will be Monday, April 15, 2013 at the Jackson County Bank Community Room, 8 Main Street in Black River Falls


The meeting will run from 10:00am - 11:00am

Brought to you by: Wisconsin Department of Transportation,

Black River Falls Downtown Association, and the Black River Area Chamber of Commerce.

The proposed projects include milling the existing concrete pavement on US 12 and WIS

54 then overlaying with asphalt pavement. Pavement marking and signs will be replaced including conversion of a portion of WIS 54 from 11th St. to 5th St. to three lanes with a two-way left turn lane (TWLTL) as the middle lane.  A bridge deck overlay on the Black River bridge and top concrete slab replacement on the Town Creek box culvert.





Black River Falls


Humidity: 100%

Wind: 0 mph

  • 6 Oct 2015 70°F 39°F
  • 7 Oct 2015 67°F 46°F